globalchange  > 影响、适应和脆弱性
DOI: 10.7249/RR455
报告号: RR-455-OSD
报告题名:
Prolonged Cycle Times and Schedule Growth in Defense Acquisition: A Literature Review
作者: Jessie Riposo; Megan McKernan; Chelsea Kaihoi
出版者: RAND Corporation
出版年: 2014
发表日期: 2014
总页数: 102
国家: 美国
语种: 英语
英文关键词: United States Department of Defense ; Military Acquisition and Procurement ; Military Technology ; Military Logistics
英文摘要: This report summarizes a selection of the defense acquisition literature from the 1960s to the present on potential sources of prolonged acquisition cycle times and schedule growth, as well as potential opportunities for improvement. It presents the range of possible causes of schedule-related problems and various recommendations cited for improving schedules by various authors and organizations. This report does not provide critical analysis or an assessment of the strengths or weaknesses of the claims made in the literature. Rather, it provides a starting point for further research or consideration by government acquisition professionals, oversight organizations, and the analytic community. We identified the following reasons for schedule delays in the literature: (1) the difficulty of managing technical risk (e.g., program complexity, immature technology, and unanticipated technical issues), (2) initial assumptions or expectations that were difficult to fulfill (e.g., schedule estimates, risk control, requirements, and performance assumptions), and (3) funding instability. The most commonly cited recommendations for reducing cycle time and controlling schedule growth in the literature are strategies that manage or reduce technical risk. Some of those recommendations include using incremental fielding or evolutionary acquisition strategies, developing derivative products (rather than brand-new designs), using mature or proven technology (i.e., commercial, off-the-shelf components), maintaining stable funding, and using atypical contracting vehicles.
URL: http://www.rand.org/content/dam/rand/pubs/research_reports/RR400/RR455/RAND_RR455.pdf
Citation statistics:
资源类型: 研究报告
标识符: http://119.78.100.158/handle/2HF3EXSE/28260
Appears in Collections:影响、适应和脆弱性
科学计划与规划
气候减缓与适应
气候变化事实与影响
气候变化与战略

Files in This Item:
File Name/ File Size Content Type Version Access License
RAND_RR455.pdf(636KB)研究报告--开放获取View Download

Recommended Citation:
Jessie Riposo,Megan McKernan,Chelsea Kaihoi. Prolonged Cycle Times and Schedule Growth in Defense Acquisition: A Literature Review. 2014-01-01.
Service
Recommend this item
Sava as my favorate item
Show this item's statistics
Export Endnote File
Google Scholar
Similar articles in Google Scholar
[Jessie Riposo]'s Articles
[Megan McKernan]'s Articles
[Chelsea Kaihoi]'s Articles
百度学术
Similar articles in Baidu Scholar
[Jessie Riposo]'s Articles
[Megan McKernan]'s Articles
[Chelsea Kaihoi]'s Articles
CSDL cross search
Similar articles in CSDL Cross Search
[Jessie Riposo]‘s Articles
[Megan McKernan]‘s Articles
[Chelsea Kaihoi]‘s Articles
Related Copyright Policies
Null
收藏/分享
文件名: RAND_RR455.pdf
格式: Adobe PDF
此文件暂不支持浏览
所有评论 (0)
暂无评论
 

Items in IR are protected by copyright, with all rights reserved, unless otherwise indicated.