DOI: | 10.2172/1018913
|
报告号: | ANL/EVS/R-11/7
|
报告题名: | Phase 1 Final status survey plan for the West Valley demonstration project. |
作者: | Six, Johan [Univ. of California, Davis, CA (United States)]; Plante, Alain F. [Univ. of Pennsylvania, Philadelphia, PA (United States)]
|
出版年: | 2011
|
发表日期: | 2011-05-31
|
国家: | 美国
|
语种: | 英语
|
中文主题词: | 土壤
; 放射性核素
|
主题词: | SOILS
; RADIONUCLIDES
|
英文摘要: | This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports. |
URL: | http://www.osti.gov/scitech/servlets/purl/1018913
|
Citation statistics: |
|
资源类型: | 研究报告
|
标识符: | http://119.78.100.158/handle/2HF3EXSE/40219
|
Appears in Collections: | 过去全球变化的重建 影响、适应和脆弱性 科学计划与规划 气候变化与战略 全球变化的国际研究计划 气候减缓与适应 气候变化事实与影响
|
File Name/ File Size |
Content Type |
Version |
Access |
License |
|
1018913.pdf(1088KB) | 研究报告 | -- | 开放获取 | | View
Download
|
|
Recommended Citation: |
Six, Johan [Univ. of California, Davis, CA ,Plante, Alain F. [Univ. of Pennsylvania, Philadelphia, PA . Phase 1 Final status survey plan for the West Valley demonstration project.. 2011-01-01.
|
|
Service | | Recommend this item | | Sava as my favorate item | | Show this item's statistics | | Export Endnote File | Google Scholar | | Similar articles in Google Scholar | | [Six, Johan [Univ. of California, Davis, CA (United States)]]'s Articles | | [Plante, Alain F. [Univ. of Pennsylvania, Philadelphia, PA (United States)]]'s Articles | 百度学术 | | Similar articles in Baidu Scholar | | [Six, Johan [Univ. of California, Davis, CA (United States)]]'s Articles | | [Plante, Alain F. [Univ. of Pennsylvania, Philadelphia, PA (United States)]]'s Articles | CSDL cross search | | Similar articles in CSDL Cross Search | | [Six, Johan [Univ. of California, Davis, CA (United States)]]‘s Articles | | [Plante, Alain F. [Univ. of Pennsylvania, Philadelphia, PA (United States)]]‘s Articles | Related Copyright Policies | Null | 收藏/分享 | |
|