DOI: | 10.2172/1227965
|
报告号: | DOE-UCAR--6744
|
报告题名: | Collaborative Proposal. Development of an Isotope-Enabled CESM for Testing Abrupt Climate Changes |
作者: | Otto-Bliesner, Bette
|
出版年: | 2015
|
发表日期: | 2015-12-10
|
总页数: | 10
|
国家: | 美国
|
语种: | 英语
|
中文主题词: | 古气候
; 碳
; 同位素
; 放射性碳
; 径流
|
主题词: | PALEOCLIMATE
; CARBON
; ISOTOPES
; RADIOCARBON
; RUNOFF
|
英文摘要: | We have made significant landmarks in our proposed work in the last 4 years (3 years plus 1 year of no cost extension). We have developed the simulation capability of the major isotopes in CESM. In particular, we have completed the implementation of the stable water isotopes (δ18O, δD) into the components for the atmosphere, ocean, land surface, runoff transport, sea ice, and coupler. In addition, the carbon isotopes (abiotic and biotic radiocarbon, δ13 C) have been implemented into the CESM ocean and land models, and long spinup simulations have been completed (Jahn et al., 2015). Furthermore, we have added abiotic Neodymium to the CESM ocean model as a tracer of ocean circulation, also measured by the proxy data community. Fullycoupled simulations with the stable water isotopes and ocean radiocarbon are currently being run for the preindustrial and also the Last Glacial Maximum. We have secured 19 million core-hours on the NWSC Yellowstone supercomputer for 12 months. Together with some CESM Paleoclimate Working Group CSL Yellowstone core hours, we are guaranteed sufficient computing for the spin-up experiments and deglaciation simulations for 21 to 15ka. |
URL: | http://www.osti.gov/scitech/servlets/purl/1227965
|
Citation statistics: |
|
资源类型: | 研究报告
|
标识符: | http://119.78.100.158/handle/2HF3EXSE/41685
|
Appears in Collections: | 过去全球变化的重建 影响、适应和脆弱性 科学计划与规划 气候变化与战略 全球变化的国际研究计划 气候减缓与适应 气候变化事实与影响
|
File Name/ File Size |
Content Type |
Version |
Access |
License |
|
1227965.pdf(2029KB) | 研究报告 | -- | 开放获取 | | View
Download
|
|
Recommended Citation: |
Otto-Bliesner, Bette. Collaborative Proposal. Development of an Isotope-Enabled CESM for Testing Abrupt Climate Changes. 2015-01-01.
|
|
|