DOI: | 10.2172/1328392
|
报告号: | None
|
报告题名: | FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report |
作者: | Burger, Chris; Wortman, David; Brown, Chris; Hassan, Syed; Humphreys, Ken; Willford, Mark
|
出版年: | 2016
|
发表日期: | 2016-03-31
|
总页数: | 315
|
国家: | 美国
|
语种: | 英语
|
中文主题词: | 碳
; 元素
|
主题词: | CARBON
; ELEMENTS
|
英文摘要: | The U.S. Department of Energyâs (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nationâs understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements â pipeline, surface facilities, and subsurface â as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOEâs closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts. |
URL: | http://www.osti.gov/scitech/servlets/purl/1328392
|
Citation statistics: |
|
资源类型: | 研究报告
|
标识符: | http://119.78.100.158/handle/2HF3EXSE/42188
|
Appears in Collections: | 过去全球变化的重建 影响、适应和脆弱性 科学计划与规划 气候变化与战略 全球变化的国际研究计划 气候减缓与适应 气候变化事实与影响
|
File Name/ File Size |
Content Type |
Version |
Access |
License |
|
1328392.pdf(19630KB) | 研究报告 | -- | 开放获取 | | View
Download
|
|
Recommended Citation: |
Burger, Chris,Wortman, David,Brown, Chris,et al. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report. 2016-01-01.
|
|
|