报告号: | 2011-5120-4
|
报告题名: | Baseline hydrologic studies in the lower Elwha River prior to dam removal: Chapter 4 in <i>Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal</i> |
作者: | Magirl, Christopher S. magirl@usgs.gov; Curran, Christopher A. ccurran@usgs.gov; Sheibley, Rich W. sheibley@usgs.gov; Warrick, Jonathan A.; Czuba, Jonathan A.; Czuba, Christiana R. cczuba@usgs.gov; Gendaszek, Andrew S. agendasz@usgs.gov; Shafroth, Patrick
|
出版者: | U.S. Geological Survey
|
出版年: | 2011
|
发表日期: | 2011
|
国家: | 美国
|
语种: | 英语
|
英文摘要: | After the removal of two large, long?standing dams on the Elwha River, Washington, the additional load of sediment and wood is expected to affect the hydrology of the lower river, its estuary, and the alluvial aquifer underlying the surrounding flood plai |
URL: | http://pubs.usgs.gov/sir/2011/5120/pdf/sir20115120_ch4.pdf
|
资源类型: | 研究报告
|
标识符: | http://119.78.100.158/handle/2HF3EXSE/44192
|
Appears in Collections: | 过去全球变化的重建 影响、适应和脆弱性 科学计划与规划 气候变化与战略 全球变化的国际研究计划 气候减缓与适应 气候变化事实与影响
|
File Name/ File Size |
Content Type |
Version |
Access |
License |
|
sir20115120_ch4.pdf(7192KB) | 研究报告 | -- | 开放获取 | | View
Download
|
|
Recommended Citation: |
Magirl, Christopher S. magirl@usgs.gov,Curran, Christopher A. ccurran@usgs.gov,Sheibley, Rich W. sheibley@usgs.gov,et al. Baseline hydrologic studies in the lower Elwha River prior to dam removal: Chapter 4 in <i>Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal</i>. 2011-01-01.
|
|
|