globalchange  > 过去全球变化的重建
DOI: 10.2172/1238045
报告号: ANL/EVS/TM--15/2
报告题名:
Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho
作者: Martino, L. E.; Jerden, J. J.; Kimmell, T. A.; Quinn, J.
出版年: 2016
发表日期: 2016-01-01
总页数: 378
国家: 美国
语种: 英语
中文主题词: ;
主题词: PHOSPHORUS ; LEAD
英文摘要: If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.
URL: http://www.osti.gov/scitech/servlets/purl/1238045
Citation statistics:
资源类型: 研究报告
标识符: http://119.78.100.158/handle/2HF3EXSE/42316
Appears in Collections:过去全球变化的重建
影响、适应和脆弱性
科学计划与规划
气候变化与战略
全球变化的国际研究计划
气候减缓与适应
气候变化事实与影响

Files in This Item:
File Name/ File Size Content Type Version Access License
1238045.pdf(36587KB)研究报告--开放获取View Download

Recommended Citation:
Martino, L. E.,Jerden, J. J.,Kimmell, T. A.,et al. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho. 2016-01-01.
Service
Recommend this item
Sava as my favorate item
Show this item's statistics
Export Endnote File
Google Scholar
Similar articles in Google Scholar
[Martino, L. E.]'s Articles
[Jerden, J. J.]'s Articles
[Kimmell, T. A.]'s Articles
百度学术
Similar articles in Baidu Scholar
[Martino, L. E.]'s Articles
[Jerden, J. J.]'s Articles
[Kimmell, T. A.]'s Articles
CSDL cross search
Similar articles in CSDL Cross Search
[Martino, L. E.]‘s Articles
[Jerden, J. J.]‘s Articles
[Kimmell, T. A.]‘s Articles
Related Copyright Policies
Null
收藏/分享
文件名: 1238045.pdf
格式: Adobe PDF
所有评论 (0)
暂无评论
 

Items in IR are protected by copyright, with all rights reserved, unless otherwise indicated.