报告题名: | Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho |
作者: | Martino, L. E.; Jerden, J. J.; Kimmell, T. A.; Quinn, J.
|
出版年: | 2016
|
发表日期: | 2016-01-01
|
总页数: | 378
|
国家: | 美国
|
语种: | 英语
|
中文主题词: | 磷
; 铅
|
主题词: | PHOSPHORUS
; LEAD
|
英文摘要: | If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal. |
URL: | http://www.osti.gov/scitech/servlets/purl/1238045
|
Citation statistics: |
|
资源类型: | 研究报告
|
标识符: | http://119.78.100.158/handle/2HF3EXSE/42316
|
Appears in Collections: | 过去全球变化的重建 影响、适应和脆弱性 科学计划与规划 气候变化与战略 全球变化的国际研究计划 气候减缓与适应 气候变化事实与影响
|
File Name/ File Size |
Content Type |
Version |
Access |
License |
|
1238045.pdf(36587KB) | 研究报告 | -- | 开放获取 | | View
Download
|
|
Recommended Citation: |
Martino, L. E.,Jerden, J. J.,Kimmell, T. A.,et al. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho. 2016-01-01.
|
|
|